This page provides information to the public concerning environmental studies on the I-69 Section of Independent Utility 13 El Dorado to McGehee. Please click on the links below for access to the documents.
August 18, 2005 – Executive Summary of the Final Environmental Impact Statement
This Executive Summary was derived from information in the Final Environmental Impact Statement (FEIS) approved August 18, 2005. The FEIS Executive Summary is available in Adobe Acrobat form by clicking here (3.5 Mb).
August 18, 2005 – Final Environmental Impact Statement
These sections of the Final Environmental Impact Statement (FEIS) and Executive Summary with links below were derived from the FEIS approved August 18, 2005. The FEIS contains an in-depth analysis of the Preferred Line (Line 5), as conducted by the Michael Baker Jr. Inc. in cooperation with the Federal Highway Administration. The FEIS is available in Adobe Acrobat form by clicking here (18.6 Mb)
Document Availability
The Final Environmental Impact Statement (FEIS) can be found at ARDOT offices near the project area. Specific locations are listed below.
ARDOT Resident Engineer’s Office #21
1932 Highway 425 N
Monticello, AR 71611
Copies of these documents or a summary may be obtained by contacting the ARDOT at:
ARDOT Environmental Division
P. O. Box 2261
Little Rock, AR 72203
(501) 569-2281