Rock Blasting to Close Lanes on Interstate 49 and Highway 549 in Bentonville

BENTON COUNTY (11-22) – Construction to build a new Bella Vista Bypass interchange with
U.S. Highway 71 in Bentonville requires rock blasting operations and intermittent lane closures,
according to Arkansas Department of Transportation (ARDOT) officials.

Weather permitting, the rock blasting will occur between 10:00 a.m. and 2:00 p.m. on Monday,
November 25 and Tuesday, November 26.
After the Thanksgiving holiday, blasting will
continue the week of December 2. During the operations, traffic will temporarily be stopped
for up to 15 minutes as a safety precaution in several locations.

  • Interstate 49 from north of the bridges over Slaughter Pen Road to State Highway 549
    (Exit 93).
  • State Highway 549 from the roundabout to the bridges over Peach Orchard Road.



Traffic control will be handled by the Arkansas State Police. Watch for warning signs and safety
personnel during the work. Motorists are encouraged to consider alternate routes as delays will
occur. The public is advised to be cautious when traveling in the work zone.

This project (Job CA0903) is part of ARDOT’s Connecting Arkansas Program and includes
constructing approximately 2.8 miles of two-lane roadway with bridge structures on U.S.
Highway 549, including a new Bella Vista Bypass interchange with U.S. Highway 71 in
Bentonville. More information on this $66.6 million project is available at
ConnectingArkansasProgram.com.

Drivers should exercise caution when approaching and traveling through all highway work
zones. Additional travel information can be found at IDriveArkansas.com or ARDOT.gov. You can
also follow us on Twitter @myARDOT.

CAP

19-336