Construction Requires New Traffic Patterns at I-49/US 71 Interchange with Bella Vista Bypass in Bentonville

BENTON COUNTY (04-24) – Construction to build the new Bella Vista Bypass interchange with
U.S. Highway 71 and Interstate 49 in Bentonville requires new traffic patterns, according to
Arkansas Department of Transportation (ARDOT) officials.

Weather permitting, crews will shift traffic in several phases to continue with construction.
Crews will use message boards, construction barrels, and barriers during the shift.

  • Monday, April 27: The northbound I-49 exit ramp to the existing roundabout (Exit 93)
    will be closed. Traffic can use alternate routes at Exits 85, 86, or 89 to access North
    Walton Boulevard and the Bella Vista Bypass. This is a permanent ramp closure as part
    of the re-designed interchange that directly connects I-49 to the Bella Vista Bypass.
  • Friday, May 1 and Saturday, May 2: Northbound I-49 mainlane traffic will be shifted
    onto temporary pavement prior to Exit 93 to continue northbound on US 71. This traffic
    pattern is estimated to be in place for approximately a year.


Watch for warning signs and safety personnel during the work. The public is advised to be
cautious when traveling in the work zone.

This project (Job CA0903) is part of ARDOT’s Connecting Arkansas Program and includes
constructing approximately 2.8 miles of roadway with bridge structures on U.S. Highway 549,
including a new Bella Vista Bypass interchange with U.S. Highway 71 in Bentonville. More
information on this $66.6 million project is available at ConnectingArkansasProgram.com.

Drivers should exercise caution when approaching and traveling through all highway work
zones. Additional travel information can be found at IDriveArkansas.com or ARDOT.gov. You can
also follow us on Twitter @myARDOT

CAP

20-119