PULASKI COUNTY (8-19) – Improvements to the Interstate 430 River Bridge require a major traffic shift for the next stage of construction, according to Arkansas Department of Transportation (ARDOT) officials.
Weather permitting, all three northbound traffic lanes will shift to the same side of the I-430 bridge and the inside southbound lane will now be on the northbound side of the bridge.
The middle and outside southbound lanes will remain in their current position.
This will allow the contractor to rehabilitate the inside half of the southbound side of the bridge.
The following closures will be between Cantrell Rd. (Highway 10) and Maumelle Blvd. (Highway 100):
- Friday night, August 20, into Saturday morning:
NB & SB: 8pm -12pm | Double left lane closures
- Saturday night, August 21,into Sunday morning:
NB & SB: 12pm – 8pm | Saturday | Single left
NB & SB: 8pm – 12pm | Sunday | Double left
SB: 8pm – 12pm | Sunday | Double left
- Sunday, August 22
SB: 12pm – 8pm | Sunday | Single Left
SB: 8pm – 6am | Monday | Double Left
Orange barrels, cones, message boards, and signage will control traffic. Additional travel information can be found at IDriveArkansas.com or ARDOT.gov. You can also follow us on Twitter @IDriveArkansas for traffic and @myARDOT for everything else.
-End-
Contact: Britni Dumas
NR 21-276
August 19, 2021