HOT SPRING COUNTY | June 28, 2024
Bridge inspection crews will alternate closure in the eastbound and westbound direction of the outside lane and shoulder on the Interstate 30 bridge over the Ouachita River between Exits 97 and 98 near Malvern. These closures will occur from 9 a.m. to 3 p.m. on Monday, July 1 and Tuesday, July 2.
Weather permitting, crews will perform a routine bridge inspection. At least one lane will remain open at all times in each direction as work is being conducted.
Traffic will be controlled with the use of cones and signage.
Drivers are urged to use caution while traveling in the area.
Additional travel information can be found at IDriveArkansas.com or ARDOT.gov.
###