PULASKI COUNTY | January 25, 2024
Weather permitting, Highway 67 Northbound between Main Street and Vandenberg Boulevard in Jacksonville will experience alternating single-lane closures from 8:30 a.m. to 2 p.m. Friday, January 26 for pavement repairs.
Crews will alternately close inside and outside lanes of Highway 67 northbound to perform pavement repairs including fixing potholes. Since this area is within a work zone, the Arkansas Department of Transportation is working with the contractor on the project to repair the damaged areas as quickly as possible.
Traffic will be controlled with message boards, construction barrels, and signage. The public is advised to be cautious when traveling in the work zone and watch for slower traffic speeds.
This project (Job CA0604) is part of ARDOT’s Connecting Arkansas Program and includes widening 2.5 miles of Highway 67 to six lanes, between Main Street (Exit 9) and Vandenberg Boulevard (Exit 11) in Jacksonville. The project also includes improvements at the James Street interchange (Exit 10A), the Gregory Street Interchange (Exit 10B), the Vandenberg Boulevard interchange (Exit 11), and conversion of the frontage roads from two-way to one-way. More information on this $145.2 million project is available at ConnectingArkansasProgram.com.
Contact: Ellen Coulter
NR 24-027
January 25, 2024