PULASKI COUNTY (4-1) – Construction on I-30 in Little Rock and North Little Rock will require lane closures, according to Arkansas Department of Transportation (ARDOT) officials.
Weather permitting, the following travel impacts will occur during the week of April 5:
- Mon., April 5 – Fri., April 9 | 7 a.m. – 5 p.m. | 3rd St. westbound | Daytime lane closure between Ferry and Sherman Sts.
- Mon., April 5 – Fri., April 9 | 9 a.m. – 3 p.m. | 4th St. intersections with Cumberland Ave., Rock St., and River Market Ave. | Daytime right lane and sidewalk closures at the intersections. Pedestrian detour routes will be signed for sidewalk closures. Some street parking will be impacted. Watch for flagging operations.
- Mon., April 5 – Fri., April 9 | 8 p.m. – 5 a.m. | 4th St. intersection with River Market Ave. | Overnight lane and sidewalk closure at the intersection. Pedestrian detour routes will be signed. Some street parking will be impacted. Watch for flagging operations.
- Mon., April 5 – Fri., April 9 | 8 p.m. – 5 a.m. | I-40 | Eastbound and westbound overnight single lane closures. Westbound lane closed between North Hills Boulevard on-ramp and the I-30 westbound overpass. Eastbound lane closed between the I-40/I-30 split and the merge from I-30 eastbound.
Traffic will be controlled by construction barrels, signage, and flagging operations. Drivers should exercise caution when approaching and traveling through all highway work zones.
A long-term and permanent travel impact interactive map is available at 30Crossing.com, along with additional project information. Additional travel information can be found at IDriveArkansas.com or ARDOT.gov. You can also follow us on Twitter @IDriveArkansas for traffic and @myARDOT for everything else.
-End-
Contact: Krista Sides
NR 21-086
April 1, 2021